2 units (till water demand and population forecasting) would be covered in MTE. The slides are available at Dr. Gaurav Saini's blog. (drgauravsaini.blogspot.com).
This is a group for the staff and students of Civil Engineering students of 2010 at Sharda University. The blog is meant for communication between the students and the faculty. Although it is one way (faculty to students) now, but we may extend the same to two-way communication. For any comments, write to me at satya.prakash@sharda.ac.in
Friday, February 28, 2014
Building Materials & Construction (Mid-term Syllabus - Backlog)
Unit I
Introduction to building materials, physical, mechanical, chemical properties, rocks and stones, bricks and clay, sand and silica, aggregates and water.
Unit II
Cement ,concrete and lime.
Introduction to building materials, physical, mechanical, chemical properties, rocks and stones, bricks and clay, sand and silica, aggregates and water.
Unit II
Cement ,concrete and lime.
Thursday, February 27, 2014
Mid Term syllabus Soil Mechanics (Backlog)
CVL 205: Soil Mechanics
Unit I: Introduction
Concept of soil,Definition and meaning of soil mechanics, History of soil mechanics
Scope of soil mechanics, Soil formation
Unit II: Weight And Volume Relationship Of Soil
Definition of soil mass, Components of soil mass, Phase diagram of soil mass and its
labeling, Weight and volume of soil with usual notation, Dry soil and wet soil
Void ratio, Porosity and their relations, Types of water in soil, Bulk density, saturated,
submerged and dry density, Difference between adsorbed water and absorbed water in
soil, Saturated, partly saturated and dry soil
Unit III: Classification Of Soil
Definition of Coarse and fine grained soil, Homogeneity, Consistency, Cohesiveness,
Toughness, Shear strength, Compressibility, Difference between coarse and fine grained
soil, Two methods of soil classification, Grain size classification of soil as per I.S.I and
classification of soil using plasticity chart, Sieve analysis and Stoke’s law, Sedimentation
analysis of soil, Particle size - Distribution curve on semi log scale, States of consistency and
its diagram, Consistency limits- Liquid limit, plastic limit, shrinkage limit and plasticity
index (P.I), Laboratory methods to find out these limits, Field identification tests
Unit IV: Permeability
Definition and understanding of permeability, Different types of soil and permeability,
Laminar and turbulent flow, Importance of permeability, Darcy’s Law
Coefficient of permeability and its determination in laboratory, Factors affecting
permeability, Confined and unconfined aquifer, Dupit’s Formula, Field determination of
permeability by pumping out and pumping in test, Concepts meaning of seepage, Effects of
seepage, Flow lines and flow net diagram (only understanding)
Wednesday, February 26, 2014
Students not filling the end term examination form
The following students have not yet filled the end-term examination form. You may contact me for further clarification. IVth Year |
||
S.No | Roll No | Name |
1 | 100107055 | Bittu Suresh Kumar |
2 | 100107108 | Mayank Bharadwaj |
3 | 100107140 | NISHANT DHARIWAL |
4 | 100107142 | NITESH SINGH |
5 | 100107161 | PRATYUSH SHARMA |
6 | 100107184 | RUPENDRA SINGH ANURAG |
7 | 100107205 | SHASHANK CHANDRA |
8 | 100107212 | SHIV PRATAP SINGH |
9 | 100107802 | AVDHESH |
IIIrd Year | ||
S.No | Roll No | Name |
1 | 110107077 | IMRAN BAIG |
2 | 110107148 | RAJAN SINGH |
3 | 110107227 | Sundram Chandan |
4 | Santanu | |
5 | Yumge padu | |
6 | Nitin Sharma | |
7 | 100107041 | Ashutosh singh |
ERA Group Interview Schedule
The bus shall leave the university campus by 06:00am. Reach well in advance so that you do not miss the bus.
Students are required to carry following documents with them at the time of
interview:
1. Resume (2 copies)
2. Photograph (3)
3. Documents (all in originals and one copy xerox)
4. University ID Card
Note: Students are requested to come in proper formals.
The interview is from 09:00am at the HIT, Mathura Campus
OCF mid term syllabus (BACKLOG)
Mid term Syllabus ---UNIT-I & UNIT-II (till critical depth calculation)
Tuesday, February 25, 2014
Revised ERA Group Nominations
Below is the revised list of students shortlisted for ERA group interview.
The revised list is based upon the following criteria,
* Removing the name of the students who have active backlog/ improvement and not reported earlier
* Removing the name of the students who have appeared at least in one interview, apart from DHFL
* Some students who have appeared in at least one interview and still nominated have been selected based upon the cgpa.
ADITYA VAIBHAV
ANUJ SHARMA
ANURAG PANDEY
ASHISH RAI
DHEERAJ SHARMA
HITESH JAIN
KANHAIYA KUMAR
RAJEEVR RANJAN
ABHISHEK DIXIT
UTSAV RAI
AMBER SUMAN
NAVEEN KUMAR
ARUN CHAUDHARY
VIVEK KUMAR
MD MANZAR
ANIMESH JAISWAL
WASEEM KARIM
SAJAL SISODIA
SHIV PRASHAD SINGH
HARSHIT RAJ
ABHISHEK KUMAR
MD NAZIM
SHEKHAR VERMA
PRATEEK SINGH
DEEPAK CHAURASIA
RAYAV… RAMA LEELA SATYA
VINAY GAUTAM
BIKRAM SINGH DHANKAR
MANOJ KUMAR GAUTAM
VIKAS KUMAR SINGH
Monday, February 24, 2014
Nominations for ERA Group
Following students have been short-listed for ERA group. Date of interview shall be notified soon. The venue shall be Mathura campus.
The shortlisting have been done, based on the nominations and resume received and removing those with any active backlog/ improvement and if they have already been selected and/ or already appeared in at least one interview.
Nominations for ERA Group
The shortlisting have been done, based on the nominations and resume received and removing those with any active backlog/ improvement and if they have already been selected and/ or already appeared in at least one interview.
Nominations for ERA Group
Name Roll No.
1. ABHISHEK KUMAR 005
2. ADITYA VAIBHAV 013
3. AKASH SHUKLA 017
4. ANUJ SHARMA 032
5. ANURAG PANDEY
6. ASISH KUMAR RAI 040
7. DHEERAJ SHARMA 067
8. HITESH JAIN
9. KANHAIYA KUMAR 089
10. RAJEEV RANJAN 172
11. ABHISHEK DIXIT 004
12. RADHEY SHAYAM BAIRAGI
13. UTSAV RAI 231
14. VINAY GAUTAM 243
15. VIVEK DIWEDI 09-157
16. AMBER SUMAN 023
17. SAURABH YADAV 200
18. NAVEEN KUMAR 133
19. ARUN 038
20. BIKRAM SINGH DANKAR 052
21. VIVEK KUMAR 250
22. MD. MANJAR HUSSAIN 111
23. ANIMESH JAISWAL 026
24. WASEEM KARIM 251
25. SHIV PRASAD SINGH
26. SAJAL SISODIA 189
27. Vijay kumar Mishra 236
28. Nitish kumar 144
29. Manoj kumar Gautam 107
30. Raghav sehgal 165
mte syllabus of mods for backlog
syllabus for mods MTE backlog
1. simple stress and strains, elastic constants
2. analysis of stress : principal stresses
3. bending stresses in beams
1. simple stress and strains, elastic constants
2. analysis of stress : principal stresses
3. bending stresses in beams
Students debarred from placement drive
The following five students are being debarred from appearing in any further campus placement drives,
1. RAHUL KAPOOR
2. RISHABH SAXENA
3. ROUSHAN KUMAR MISHRA
4. SHABI QURESHI (203)
5. WAYENBAM INDERKUMAR SINGH
They nominated themselves for the Realty Business Intelligence drive and were shortlisted to appear in the interview. However, they did not appear in the interview and also did not inform neither the department nor the placement cell. Due to them, five other students did not get a chance to appear in the interview.
Saturday, February 22, 2014
Ratings of Realty Business Intelligence
Based upon the performance of the candidates who appeared in the Realty Business Intelligence Interview, the ratings have been shared by the company. The rated candidates shall be interviewed some time later for final selection.
NA: Not rated
Uzma was found ineligible as the position was strictly for male candidates.
S.No
|
Candidate Name
|
Interviewed On
|
Interviewer Rating
|
1
|
Wasim Khan
|
20-Feb-14
|
A+
|
2
|
Suyush
|
20-Feb-14
|
B
|
3
|
Vibhu Sharma
|
20-Feb-14
|
B+
|
4
|
Vishal Singh
|
20-Feb-14
|
B+
|
5
|
Zishan Riyaz
|
20-Feb-14
|
A
|
6
|
Shivanshu Singh
|
20-Feb-14
|
B+
|
7
|
Akash Shukla
|
20-Feb-14
|
B
|
8
|
Manoj Kr. Gautam
|
20-Feb-14
|
A
|
9
|
Raghav Sehgal
|
20-Feb-14
|
A+
|
10
|
Ritvik Kapruwan
|
20-Feb-14
|
A
|
11
|
Atul Kr. Chaudhary
|
20-Feb-14
|
NA
|
12
|
Chirag Choudhary
|
20-Feb-14
|
NA
|
13
|
Nishant Dhariwal
|
20-Feb-14
|
NA
|
14
|
Armaan Haider Zaidi
|
20-Feb-14
|
NA
|
15
|
Uzma
|
20-Feb-14
|
Ineligible
|
ERA Group Placement Notice
The interview is scheduled on 27th at SGI, Mathura Campus. 30 nominations are required.
Use the below form to nominate your name and send the cv to uploadhere3@gmail.com
Last date for sending the cv is 23rd morning 10:00am. The nominations received till 10:00am on 23rd Feb, shall be considered for shortlisting.
Company Name
|
ERA Group
|
|
Target Degrees & Branches
|
Btech
(Civil) (Only Male)
|
|
CTC and Incentives
|
Rs.15, 800/-PM + (Attractive
Retention Bonus for three years +Free Accommodation on sites +Local
conveyance at sites) other benefits as per Company Policies.
After
Probation Period:
Depends upon performance during 6 months (Can be between 17 k to 23k) + other
Benefits, as per company policy.
After
Probation Period:
After
Completion of Ist yr- Rs. 30,000/-
After
Completion of IInd yr- Rs. 50,000/-
After
Completion of IIIrd yr- Rs. 65,000/-
|
|
Designation
|
|
|
Joining Location
|
Delhi (NCR) |
|
Last date to apply
|
24th
Feb 2014
|
|
Selection Process
|
1)Written
Test.
2)HR/Technical
Interview
|
|
Percentage Cut-off
|
60% at
B Tech Level ( No active Backlog)
|
|
Any Bond
|
NA
|
|
Campus Date & Time
|
27th Feb 2014 at 9.30 A.M. sharp
|
Company Profile:
Era is a world-class engineering, construction
and services conglomerate, well positioned in key infrastructure markets which
offer long term growth potential. A versatile organization comprising of five
companies - Era Infra
Engineering Limited, Era Building
Systems Limited, Era Landmarks
(India) Limited, Era E-Zone
(India) Limited and Era Power
(India) Private Limited, the group operates across the fastest, synergistic and
most exciting business segments in Indian economy – infrastructure development,
pre-engineered buildings, real estate, hospitality & entertainment and
power. Headquartered in New Delhi, theEra group
of companies is promoted by Mr. H.S. Bharana, a civil engineering professional
with over two decades of experience in the infrastructure business and a
recognized thought leader in nation building.
Friday, February 21, 2014
Passes for Chorus 2014
The passes for Chorus are available in the department. You may collect the same between 02:00pm - 04:00pm from room no. 104, set3.
Thursday, February 20, 2014
CVL013: Design of Prestressed Concrete - Class Test 03 - Section A Group 2
The Class Test 03 for Section - A Group 2 will be conducted on 21-02-2014 (Friday), from 08.45 AM to 09.40 AM, instead of the regular schedule of the Tutorial Class (11.30 AM - 12.25 PM).
Please inform to your classmates.
Please inform to your classmates.
Regular Classes on 21st Feb
As the Chorus Inauguration is scheduled for tomorrow at 05:00pm, regular classes shall be held tomorrow i.e., on 21st Feb, 2014.
Attendances for the classes shall be marked as in the regular days.
Resumes for Techno Commercial Profile
A company (STP Limited (http://www.stpltd.com/) engaged in construction related activities needs students for techno-commercial profile. The details of the job are,
1. To prepare technical proposal
2. To liaison with the civil Architects
& consultants.
3. To find product application problems & its
rectification.
4. Assisting in acquiring new infrastructure
projects.
5. Basically it’s a techno commercial
profile.
No. of positions – 5
Salary would be around Rs 12K – Rs 15K per
month.
Send the resume to the uploadhere3@gmail. com specifying subject "techno-commercial", ONLY IF you are really interested in such a profile. DO NOT SEND resume if you are not interested in sales/ marketing job.
After sending the resume, fill in the information in this form also.
The last date for submission of nomination is 23rd Feb, 2014
4th year section C
QUANTITY SURVEYING
there will be change in class timing of Quantity surveying lecture on Thursday
4th lecture (11:30 -12:25 pm) will be shifted to 3rd lecture (10:35 - 11:30 am) on Thursday
there will be change in class timing of Quantity surveying lecture on Thursday
4th lecture (11:30 -12:25 pm) will be shifted to 3rd lecture (10:35 - 11:30 am) on Thursday
End Term Examination Form Filling
Those of you who have not yet filled the end term examination form may fill the same between 10:30am - 12:00noon today (20th Fab, 2014).
NO further date shall be announced for the same.
NO further date shall be announced for the same.
CVL013: Design of Prestressed Concrete - Section A and B - Tutorial 03
The Question Paper for Tutorial 03 has been uploaded in the course website in the following link:
Tutorial 03
Tutorial 03
Wednesday, February 19, 2014
Backlog/Improvement ED: Assignment 1
Submit the assignment on or before 28-02-14. Late submission will
attract -2 marks for every day of late submission. List of question are
given at the link:
https://drive.google.com/file/d/0Bwy1ZhlP9e41SjBXbkctQU5QZm8/edit?usp=sharing
https://drive.google.com/file/d/0Bwy1ZhlP9e41SjBXbkctQU5QZm8/edit?usp=sharing
Backlog/Improvement ED: Syllabus
Here it is
https://drive.google.com/file/d/0Bwy1ZhlP9e41ZWRyYVBBZ2RIUU0/edit?usp=sharing
Four units will be for MTE from the above syllabus.
https://drive.google.com/file/d/0Bwy1ZhlP9e41ZWRyYVBBZ2RIUU0/edit?usp=sharing
Four units will be for MTE from the above syllabus.
Quantity surveying mid term syllabus and previous year question paper
|
Title
|
Unit 1
|
General items of work in Building –
Standard Units Principles of working out quantities for detailed and abstract
estimates – Approximate method of Estimating.
|
Unit 2 |
Detailed Estimates
of Buildings
|
Unit 3
|
Earthwork for roads
and canals
|
https://docs.google.com/document/d/1ow_2IhaC30EHJ5eljJR57xpWVRNcisJE9LqYJ9RN6wg/edit?usp=sharing
Realty Business Intelligence Nominations and Interview
Following students have been shortlisted for the interview of Realty Business Intelligence (RBI).
The detail of off-campus drive is as,
Date: 20th Feb, 2014
Venue:
H-58
Realty Business Intelligence Nominations | |||||
Name | Roll No | Adm No | System ID | CGPA | Active Backlog |
Akash Shukla | 100107017 | 10SETCIVL126 | 2010000345 | 6.73 | N |
Armaan haider zaidi | 100107034 | 10SETCIVL093 | 7.34 | N | |
Atul Kumar Chaudhary | 100107046 | 10SETCIVL037 | 2010000565 | 6.66 | N |
Chirag choudhary | 100107057 | 10setcivl378 | 2010000646 | 6.16 | N |
MANOJ KUMAR GAUTAM | 100107107 | 10SETCIVL336 | 2010001002 | 7.87 | N |
nishant dhariwal | 100107140 | 10setcivil199 | 6.7 | N | |
RAGHAV SEHGAL | 100107165 | 10SETCIVL357 | 2010001349 | 7.4 | N |
RAHULKAPOOR | 100107171 | 2010001376 | 6.61 | N | |
Rishabh Saxena | 100107177 | 10setcivloo4 | 2010001437 | 6.89 | N |
ritvik kapruwan | 100107179 | 10setcivl130 | 2010002227 | 6.4 | N |
Roushan Kumar Mishra | 100107183 | 10SETCIVL050 | 2010001471 | 6.86 | N |
SHABI QURESHI | 100107203 | 10SETCIVL165 | 2010001576 | 7.45 | N |
Shivanshu Singh | 100107214 | 10SETCIVL318 | 2010001638 | 7.19 | N |
Suyash Srivastava | 100107224 | 10setcivl243 | 2010001744 | 6.72 | N |
uzma imtiyaz | 100107232 | 10setcivl412 | 2010001805 | 7.41 | N |
VIBHU SHARMA | 100107235 | 10SETCIVIL363 | 2010001830 | 6.66 | N |
VISHAL SINGH | 100107248 | 10SETCIVL198 | 2010001886 | 7.42 | N |
wasim khan | 100107252 | 10SETCIVL245 | 2010001915 | 8.2 | N |
WAYENBAM INDRAKUMAR SINGH | 100107253 | 10SETCIVL228 | 6.81 | N | |
zishan riyaz | 100107256 | 10setcivl035 | 2010002259 | 7.58 | N |
The detail of off-campus drive is as,
Date: 20th Feb, 2014
Venue:
H-58
5th floor
Himalaya House
KG Marg,Connaught Place
New Delhi
Concerned person-Shashank
Time-10:30 AM
Dress Code: Strict Formals Only
Subscribe to:
Posts (Atom)