Notice:
Assignments for CA Marks
It
is to inform the below student to submit the below assignments for assigning
your CA marks for this summer term. The last date of submission these 04
assignments is 03 July 2015. Please
submit these assignments to Ms Sarmistha Rudra Paul, Assistant Professor, Dept.
of Civil Engineering, Sharda University. No soft copy will be accepted. You
have to submit these assignments in hard copy.
P.
Mukherjee
Roll No.
|
Enr. No.
|
Name of Student
|
Course
|
Branch
|
Paper
ID
|
Subject
Code
|
Subject
Name
|
|
110107162
|
11SETCIVL297
|
SAHAR RAZA
|
B. Tech.
|
CE
|
0911
|
OEL 011
|
QUANTITY SURVEYING
|
SUMMER-4
|
110107196
|
11setcivl271
|
SONU KUMAR
|
B. Tech.
|
CE
|
0911
|
OEL 011
|
QUANTITY SURVEYING
|
SUMMER-4
|
ASSIGNMENT
-1
1.
What are the different methods of
estimation? Explain [a] detail of measurement form and [b] Abstract of estimated
cost form.
2.
Explain briefly any ten items of
estimation of building with its units.
3.
Briefly
explain need for estimation? Explain its salient features.
ASSIGNMENT
-2
1.
List
the factors to be considered while preparing detailed estimate and explain briefly?
2.
The
internal dimensions of a single roomed building are 5.75 x 3.75m. Find the
Centre line length of room and parapet. If the wall thickness of room and
parapet are 300mm and 250mm respectively.
3.
List
the difference between centre line method and long wall-short wall method of
taking out measurements.
ASSIGNMENT
-3
1.
Why total center line length for different
item of building estimation is changing? Explain the reason with diagram.
2.
Define
the following terms [a] reducing calculation [b] degree of accuracy in estimating
ASSIGNMENT
-4
1.
Prepare
an approximate estimate of building project with total plinth area of all
building is 800 sqm. and from following data. Determine the total cost of
building project.
i) Plinth area rate Rs. 4500 per sqm
ii) Cost of water supply @7½%of cost of
building.
iii) Cost of Sanitary and Electrical
installations each @ 7½% of cost of building.
iv) Cost of architectural features @1% of
building cost.
v) Cost of roads and lawns @5% of building
cost.
vi) Cost of P.S. and contingencies @4% of
building cost.
2. The plinth area of an
apartment is 500 sqm. Determine the total cost of building from the following
data:
a) Rate of construction
= Rs.1230/--per m3.
b) The height of
apartment = 16.25 m
c) Water Supply,
Sanitary and Electrical installations each at 6% of building cost.
d) Architectural
appearance @ 1% of building cost.
e) Unforeseen item @2%
of Building cost.
f) P.S. and contingencies @4% of building.