project list
This is a group for the staff and students of Civil Engineering students of 2010 at Sharda University. The blog is meant for communication between the students and the faculty. Although it is one way (faculty to students) now, but we may extend the same to two-way communication. For any comments, write to me at satya.prakash@sharda.ac.in
Monday, March 31, 2014
BMC Class test II - Backlog
BMC 2nd class test for backlog students will be conducted on 4th April at 11:30 pm. Students may contact to me regarding the schedule of test or any other information.
Topics: Timber, Ferrous & non ferrous materials.
Topics: Timber, Ferrous & non ferrous materials.
BMC Presentation - Backlog
BMC Presentation for backlog students will be conducted on 3rd April at 2:15 pm. Students may contact to me regarding the schedule of ppt or any other information.
Topic: Polymer as a building material.
Topic: Polymer as a building material.
Sunday, March 30, 2014
Quadra Infratel Synergies Pvt. Ltd., Noida
Post: GET Civil
Company: Quadra Infratel Synergies Pvt. Ltd., Noida
No of vacancy: 10
nominations date is extended till 6th April 2014. The Said Company will be in campus on 9th April 2014.
Submit your nomination here
Salary: 7-12k per month
Eligibility and other conditions:
* More than 50% marks should a student have in their X & XII board, and more than 60% in their B.Tech.
* Company have 6 months training period for fresher candidates.
* Based on the performance of the student during training period, may confirm his/her at executive level in the concern department.
* Student will be depute based on the vacancies and the preference of the students within the given locations.
* During training period, student will earn the same, however after his/her confirmation, we have the provision to review the salary for the deserving candidates.
Company: Quadra Infratel Synergies Pvt. Ltd., Noida
No of vacancy: 10
nominations date is extended till 6th April 2014. The Said Company will be in campus on 9th April 2014.
Submit your nomination here
Salary: 7-12k per month
Eligibility and other conditions:
* More than 50% marks should a student have in their X & XII board, and more than 60% in their B.Tech.
* Company have 6 months training period for fresher candidates.
* Based on the performance of the student during training period, may confirm his/her at executive level in the concern department.
* Student will be depute based on the vacancies and the preference of the students within the given locations.
* During training period, student will earn the same, however after his/her confirmation, we have the provision to review the salary for the deserving candidates.
Saturday, March 29, 2014
MTE UFM Meeting
The meeting of CUM for deciding the case of UFM of SET reported in MTE shall be held on March 31, 2014 at 1:00 pm in room no 105, SET-I.
You may attend the same, if desired.
You may attend the same, if desired.
Friday, March 28, 2014
Updated Assingment for 4C G2
Please see the link dear all group students of the concern group.
Submit it til 04/04/14
https://docs.google.com/document/d/1xfEDbzqyJbmeOQxBK5yDqfkJJenAoWas8uR7S1KPpew/edit?usp=sharing
Syed Emad uddin Ahmed
Submit it til 04/04/14
https://docs.google.com/document/d/1xfEDbzqyJbmeOQxBK5yDqfkJJenAoWas8uR7S1KPpew/edit?usp=sharing
Syed Emad uddin Ahmed
Thursday, March 27, 2014
Civil department events @ tech fest Contrivance
Civil Department events @ tech fest Contrivance:
- 1. AutoCAD
- 2. Setu Nirmaan
- 3. Megamind-14 the Quiz
For details visit: www.contrivance.co.in
Contact for queries:
Pankjesh Sahni: 9953430967
Harshad Agrawal: 8882716021
Presentation for Quantity Surveying course (Section A, B and D)
Presentation for quantity surveying course will be conducted every Thursday :
Section A - Starting from 3 April 2014 (On every Thursday)
Section B - Starting from 3 April 2014 (On every Thursday)
Section D - Starting from 3 April 2014 (On every Thursday)
Ideally it should be individual presentation. However you can make team of 3-4 members. Maximum number of students in a team should not exceed 5. Your group members should be from same section. For example if you are in section A then group members should be from Section A and vice versa. Evaluation for presentation will be done and attendance is mandatory. If you are absent then marks will be deducted accordingly. The presentation should be 10-15 minute duration.
You are free to choose any of the topic mentioned below or you can also select your own topic related to quantity surveying. Presentation on the same topic by different teams cannot be same. If it is found that any other presentation is similar to yours, it will result into losing of marks for all the teams having similar presentation.
EVALUATION SCHEME
Presentation Content 10 marks
Accurate, informative, good balance of breadth and depth, demonstrates
understanding of fundamentals, demonstrates insight into leading edge of
knowledge on topic, educates audience effectively, handles questions well.
Presentation Style 10 marks
Effective slides, material sufficiently referenced, effective delivery, professional
style, polished, articulate, good pace, captivates audience.
Send me an email (gaurav.goel@sharda.ac.in) containing name and roll number of your group members and topic by 2 April 2014 positively. No changes in group members will be accepted later.
SUGGESTED LIST OF TOPICS
1) High rise vs low rise development
2) Importance of specifications in cost estimation of building
3) Bar bending schedule
4) Construction waste management
5) Low cost construction
6) Importance of time management in construction project
7) Importance of material management in construction project
8) Importance of human resource in construction project
9) Necessity of valuation and various methods of valuation for civil engineering structres
10) Necessity and types of conracts
11) Costing for civil engineering projects
12) Analysis of rates and schedule of rates
Section A - Starting from 3 April 2014 (On every Thursday)
Section B - Starting from 3 April 2014 (On every Thursday)
Section D - Starting from 3 April 2014 (On every Thursday)
Ideally it should be individual presentation. However you can make team of 3-4 members. Maximum number of students in a team should not exceed 5. Your group members should be from same section. For example if you are in section A then group members should be from Section A and vice versa. Evaluation for presentation will be done and attendance is mandatory. If you are absent then marks will be deducted accordingly. The presentation should be 10-15 minute duration.
You are free to choose any of the topic mentioned below or you can also select your own topic related to quantity surveying. Presentation on the same topic by different teams cannot be same. If it is found that any other presentation is similar to yours, it will result into losing of marks for all the teams having similar presentation.
EVALUATION SCHEME
Presentation Content 10 marks
Accurate, informative, good balance of breadth and depth, demonstrates
understanding of fundamentals, demonstrates insight into leading edge of
knowledge on topic, educates audience effectively, handles questions well.
Presentation Style 10 marks
Effective slides, material sufficiently referenced, effective delivery, professional
style, polished, articulate, good pace, captivates audience.
Send me an email (gaurav.goel@sharda.ac.in) containing name and roll number of your group members and topic by 2 April 2014 positively. No changes in group members will be accepted later.
SUGGESTED LIST OF TOPICS
1) High rise vs low rise development
2) Importance of specifications in cost estimation of building
3) Bar bending schedule
4) Construction waste management
5) Low cost construction
6) Importance of time management in construction project
7) Importance of material management in construction project
8) Importance of human resource in construction project
9) Necessity of valuation and various methods of valuation for civil engineering structres
10) Necessity and types of conracts
11) Costing for civil engineering projects
12) Analysis of rates and schedule of rates
Clear your pending dues
Following students are requested to clear the dues, else they
will not be allowed to appear in the end-term examination
S.No. | System Id | Student name | Academic Group | Program | Plan | Readmit Term | Prog Action | Currency Code | Balance Amount |
1 | 2010000581 | Amrit,Ayush | SET | B.Tech. | Civil | 1001 | Activate | INR | 1400 |
2 | 2010000939 | Arpit,Kumar | SET | B.Tech. | Civil | 1001 | Activate | INR | 1400 |
3 | 2010001437 | Saxena,Rishabh | SET | B.Tech. | Civil | 1001 | Activate | INR | 1400 |
4 | 2010001431 | Satya Leela Kumar,Rayavarapu Rama | SET | B.Tech. | Civil | 1001 | Activate | INR | 1680 |
5 | 2010000521 | Choudhary,Arun Singh | SET | B.Tech. | Civil | 1001 | Activate | INR | 1900 |
6 | 2010001235 | Singh,Pankaj Kumar | SET | B.Tech. | Civil | 1001 | Activate | INR | 3400 |
7 | 2009001140 | Varshney,Shubhendu | SET | B.Tech. | Civil | 901 | Activate | INR | 5900 |
8 | 2010001019 | Bhardwaj,Mayank | SET | B.Tech. | Civil | 1001 | Activate | INR | 11600 |
9 | 2010001595 | Chandra,Shashank | SET | B.Tech. | Civil | 1001 | Activate | INR | 34560 |
Wednesday, March 26, 2014
BMC Test - Backlog
BMC Test for backlog students will be conducted on 28th March at 12:25 pm. Students may contact to me regarding the schedule of test or any other information.
Topics: Rock, Clay & Brick, Cement, Concrete (Short type)
Topics: Rock, Clay & Brick, Cement, Concrete (Short type)
Monday, March 24, 2014
Updated Assignment for the 4C G2 24 03 14
Please see the link dear all group students of the concern group.
https://docs.google.com/document/d/1xfEDbzqyJbmeOQxBK5yDqfkJJenAoWas8uR7S1KPpew/edit?usp=sharing
Syed Emad uddin Ahmed
https://docs.google.com/document/d/1xfEDbzqyJbmeOQxBK5yDqfkJJenAoWas8uR7S1KPpew/edit?usp=sharing
Syed Emad uddin Ahmed
4D G1 24 3 14
Dear students of this group (4D G1) (24 3 14) please seethe link again and complete it till tomorrow 25 03 14.
https://docs.google.com/document/d/1rG7IzCQ3e7vYJgs2b3yx1NW4Uu-H2xpf-84dtqu0RQ8/edit?usp=sharing
Regards
Syed Emad uddin Ahmed
https://docs.google.com/document/d/1rG7IzCQ3e7vYJgs2b3yx1NW4Uu-H2xpf-84dtqu0RQ8/edit?usp=sharing
Regards
Syed Emad uddin Ahmed
CVL013: Design of Prestressed Concrete - Section A, Group 2 - Change in time of Tutorial Class
The tutorial class of Section A, Group 2 will be shifted from 11.30-12.25 on Fridays to 12.25-13.20 on Thursdays till further notification.
Sunday, March 23, 2014
Mid Term marks
Dear All students now you can exess the link. Their was some setting problem with the drive it has been corrected
Please everyone should see his marks in the recent Mid Term test the link is blow, those who have any essential quarry regarding marking they may come to me tomorrow.
https://drive.google.com/?tab=mo&authuser=0#my-drive
Regards
Syed Emad uddin Ahmed
lecturer
Please everyone should see his marks in the recent Mid Term test the link is blow, those who have any essential quarry regarding marking they may come to me tomorrow.
https://drive.google.com/?tab=mo&authuser=0#my-drive
Regards
Syed Emad uddin Ahmed
lecturer
Submission of 1st draft of Thesis (by 10.4.14)
- Each group is required to submit their first draft of the thesis to their respective guides for evaluation in the format given in the previous post.
- The last date of thesis submission is April 10th, 2014.
- After the necessary corrections, only then the students can go for the Final draft of the thesis to be submitted.
- Any body failing to report on time will get a zero in the evaluation.
FINAL YEAR PROJECT FORMAT
Final Year project thesis format
Here is
the sequence of chapters/units that you have to follow.
1. Cover page (including Project
title, name of group memebers and sharda logo (with name of university and name
of department))
2. Title Page (including the Project
Title, name and roll no. of group members, name of Guide, Academic year, etc,)
3. Technical Summary or abstract (~
1 page)
4. Certificate of Completion (to be
signed by the Project guide)
Should
contain the statement:
“This is
to certify that the project report entitled “……………….” submitted by Mr.
……., Mr. ……… and Mr. …. in partial fulfillment of the requirements
for the award of Bachelor of Technology Degree in Civil Engineering at
Sharda University, Greater Noida is an authentic work carried out by them under
my supervision and guidance.
(name &
sign of each group memeber)
(name &
sign of project guide) (sign
of external examiner)
4. Contribution of Authors (should
mention the individual effort of the group members)
5. Acknowledgements
6. Table of Content (including page
numbers for various chapters and sub-sections)
7. List of figures and photos
8. List of Tables
9. List of Nomenclature or
Abbreviations used
10. Main Text
ü Ch 1: Introduction
(i) Problem statement or Thesis
Statement or Aim or Objective
ü Ch. 2: Literature review
ü Ch. 3: Methodology Adopted
ü Ch. 4: Results
ü Ch. 5:Conclusions and Scope for
Future Work
11. References or Bibliography
12. Appendices
- Each group is required to submit their first draft of the thesis to their respective guides for evaluation. The last date of thesis submission is April 10th, 2014.
- After the necessary corrections, only then the students can go for the Final draft of the thesis to be submitted. Any body failing to report on time will get a zero in the evaluation.
Quiz of CVL 304 for backlog students (shifted from 24th march to 27th march 2014)
there is change in date and time for the quiz of CVL 304 Design of steel structure (backlog students)
test will be on 27th march 2014 at 2:15pm
syllabus remain same.
test will be on 27th march 2014 at 2:15pm
syllabus remain same.
Saturday, March 22, 2014
Friday, March 21, 2014
Realty Business Intelligence Final Interview on 22nd March
The final interview of the A,A+, B and B+ category students (listed below) is scheduled tomorrow (22nd March) at 10:30 AM.
The venue and contact person is the same as communicated in earlier
mail.
S.No
|
Candidate
Name
|
Interviewed
On
|
Interviewer
Rating
|
1
|
Wasim
Khan
|
20-Feb-14
|
A+
|
2
|
Suyush
|
20-Feb-14
|
B
|
3
|
Vibhu
Sharma
|
20-Feb-14
|
B+
|
4
|
Vishal
Singh
|
20-Feb-14
|
B+
|
5
|
Zishan
Riyaz
|
20-Feb-14
|
A
|
6
|
Shivanshu
Singh
|
20-Feb-14
|
B+
|
7
|
Akash
Shukla
|
20-Feb-14
|
B
|
8
|
Manoj Kr.
Gautam
|
20-Feb-14
|
A
|
9
|
Raghav
Sehgal
|
20-Feb-14
|
A+
|
10
|
Ritvik
Kapruwan
|
20-Feb-14
|
A
|
All the best.
Apaar Infratech off campus drive
Apaar Infratech off campus drive
Last date for applying is 23 March 2014
job profile
https://drive.google.com/file/d/0Bwy1ZhlP9e41ZWRva1A0U3BtYVE/edit?usp=sharing
this to your kind notice that Apaar infratech still has a
good numbers of positions to close and have again asked for students profiles
Eligibility Criteria: 60% throughout (With no Active Backlogs)
Name Of Company: Apaar InfratechLast date for applying is 23 March 2014
job profile
https://drive.google.com/file/d/0Bwy1ZhlP9e41ZWRva1A0U3BtYVE/edit?usp=sharing
Updated for new link to be shared Assignment for 4D G1 21 3 14
It has to be noted by students of 4D G1 who have not present in todays tutorial test has to submit the assignment on 25 March 14 see the link below complete it till date !
Syed Emad uddin Ahmed
https://docs.google.com/document/d/1rG7IzCQ3e7vYJgs2b3yx1NW4Uu-H2xpf-84dtqu0RQ8/edit?usp=sharing
Update
Syed Emad uddin Ahmed
https://docs.google.com/document/d/1rG7IzCQ3e7vYJgs2b3yx1NW4Uu-H2xpf-84dtqu0RQ8/edit?usp=sharing
Update
CVL204: Structural Analysis - Backlog/Improvement - Assignments ans Class Test
Please find below the links for accessing the assignments of CVL204: Structural Analysis - Backlog/Improvement Exams. Deadline for submitting the assignment: 18-04-2014.
Schedule of Class Tests:
Schedule of Class Tests:
- Dates: 02-04-2014, 04-04-2014, 09-04-2014, 11-04-2014, 16-04-2014, 18-04-2014
- Time: 15:10 - 16:05
Four Class Tests, 10 marks each, will be conducted based on the four Assignments.
A student may appear for maximum two tests in a day as per the above mentioned schedule.
The marks for each test will be calculated as follows:
Mark for each assignment = 1.5*(Marks obtained in test based on that respective assignment) <= 10
Components of CA
A student may appear for maximum two tests in a day as per the above mentioned schedule.
The marks for each test will be calculated as follows:
Mark for each assignment = 1.5*(Marks obtained in test based on that respective assignment) <= 10
Components of CA
- Assignment = 20
- Class Test = 20
Subscribe to:
Posts (Atom)