Wednesday, April 18, 2012

BMC Assignment for leftover students

For those who missed the earlier on the assignment(s) due to any reasons may submit the assignment on
"Construction of Tokyo Sky Tower"

The document, of 1000 words maximum, should contain the following,
1. About the tower
2. Construction methodology
3. Materials used
4. Uses

For those who have missed either one or both the assignments, shall be evaluated on the basis of this assignment only for the Assignment part of their Continuous assessment.

Warning: Do not copy verbatim from "Wikipedia" or any such site. Try to prepare the document on your own.

The last date for the submission is 27th April, 2012.