This is a group for the staff and students of Civil Engineering students of 2010 at Sharda University. The blog is meant for communication between the students and the faculty. Although it is one way (faculty to students) now, but we may extend the same to two-way communication. For any comments, write to me at satya.prakash@sharda.ac.in
Friday, January 31, 2014
Thursday, January 30, 2014
Non submission of project synopsis (updated list as on 31.1.14)
The following students have not submitted their project synopsis. If
we do not receive the same by this Saturday i.e., Feb,1 you shall be
awarded -50% in the internal.
Roll No |
90107043 |
90107084 |
90107086 |
100107055 |
100107108 |
100107145 |
100107147 |
100107155 |
100107156 |
100107157 |
100107161 |
100107175 |
100107184 |
100107199 |
100107212 |
100107240 |
List of Unregistered Students
List of Unregistered Students
If you have registered yourselves and still find your name in the above list, meet me.
If you have registered yourselves and still find your name in the above list, meet me.
Wednesday, January 29, 2014
PROJECT GUIDE ALLOCATION (updated on 30 1.14)
Students are required to contact their respective Guides for the evaluation of their weekly progress and attendance from this week itself.
They are required to come to their Guide with their detailed synopsis specifying their total progress of work with time duration.
Do report if their is any doubt.
Here is the link for the list of guides for the respective projects.
They are required to come to their Guide with their detailed synopsis specifying their total progress of work with time duration.
Do report if their is any doubt.
Here is the link for the list of guides for the respective projects.
Microwave Remote Sensing Course
ISRO and Sharda University is orgainsing a course on “MICROWAVE (SAR) REMOTE SENSING FOR NATURAL RESOURCES”.
SHARDA UNIVERSITY WILL BE TELECASTING LIVE LECTURE/PRACTICAL OF THE PROGRAMME FROM IIRS IN A DEDICATED CLASSROOM WITH FACILITIES.
FOR THOSE ATTENDING THIS PROGRAM UNIVERISTY WILL PROVIDE BUS FACILITITY UPTO SECTOR 32, NOIDA METRO STATION IN THE EVENING.
COURSE DURATION: 03RD FEB TO 29TH MARCH 2014 (4/5 DAYS WEEK)
COURSE TIMING: 4.00 P.M TO 5.30 P.M
VENUE: SET, SHARDA UNIVERSITY , GREATER NOIDA.
NO. OF SEATS: 50 LIMITED (FIRST COME FIRST SERVE BASIS)
REGISTRATION FEES: Rs.300/-
(INCLUDES CERTIFICATE, EXAM FEES, NOTEPAD, PEN & REFRESHEMENT)
(LATE REGISTRATION RS.100/- EXTRA)
LAST DATE FOR REGISTRATION: 29TH JAN 2014
ELIGIBILITY: FINAL YEAR B.TECH STUDENTS AND M.TECH STUDENTS.
FOR THOSE ATTENDING THIS PROGRAM UNIVERISTY WILL PROVIDE BUS FACILITITY UPTO SECTOR 32, NOIDA METRO STATION IN THE EVENING.
Placement Notice: Apaar Infratech
Company Name |
Apaar Infratech |
Target Degrees & Branchesce |
B Tech (Civil) |
CTC | Upto 15 K |
Designation |
GET |
Joining Location |
NCR |
Joining Date/Month |
Immediate |
Selection Process (No. of Interview Rounds) |
Written Technical Test
Face to Face Technical
Interview
|
Percentage Cut-off |
60% throughout |
Any Bond |
2 Years |
Campus Date & Time |
10th Feb 2014 At Sharda University |
Tuesday, January 28, 2014
UFM cases meeting
The meeting of CUM, for deciding the cases of UFM (Major and Minor) in
the odd Term Examinations, is being scheduled on Jan 30, 2014 at 11:30
am in the office of the COE.
Following students have to report for the meeting.
Minor.
1) Shubham Verma 2012004140 120107221
2)Akshay Sharma 2011000456 110107026
Major
1) Vishwajeet Singh 2012011255 120106283
2)Rajan Sharwan 2012011613 120107185
Minor:
2010000629 Briddhi Chandra Giri 100106803
2010000318 Ankit Raghuvanshi 100106061
2010001779 Gabriel Toby 110121040
2010001164 Nikhil 100107136
Major:
2011001203 Ravi Tiwari 110106218
2011000866 Kumar Pratik 110106119
2009001140 Shubhendra Varshney 090107139
2011000624 Bhaskar Kumar Chaudhary 110122011
2011001032 Nedem Ahmed 110122032
2011000333 Akhil Dhaka 110107025
2011001595 Vaibhav Guliyan 110107210
2011001121 Pavan Kumar Varshney 110107132
Minor.
1) Akhilesh Kumar Singh 10SETCIVL115(2010000361) 100107018
2) Mayank Bhardwaj 10SETCIVL182(2010001019) 100107108
3) JIbran Naveed 10SETCSE288(2010000859) 100101099
4) Vempati Anvesh 10SETCSE343(2010002472) 100101260
5) Ankit Anand 10SETECE251(2010000452) 100103047
Major
1) Henery Gani 10SETIT231(2010000748) 100102032
the odd Term Examinations, is being scheduled on Jan 30, 2014 at 11:30
am in the office of the COE.
Following students have to report for the meeting.
Minor.
1) Shubham Verma 2012004140 120107221
2)Akshay Sharma 2011000456 110107026
Major
1) Vishwajeet Singh 2012011255 120106283
2)Rajan Sharwan 2012011613 120107185
Minor:
2010000629 Briddhi Chandra Giri 100106803
2010000318 Ankit Raghuvanshi 100106061
2010001779 Gabriel Toby 110121040
2010001164 Nikhil 100107136
Major:
2011001203 Ravi Tiwari 110106218
2011000866 Kumar Pratik 110106119
2009001140 Shubhendra Varshney 090107139
2011000624 Bhaskar Kumar Chaudhary 110122011
2011001032 Nedem Ahmed 110122032
2011000333 Akhil Dhaka 110107025
2011001595 Vaibhav Guliyan 110107210
2011001121 Pavan Kumar Varshney 110107132
Minor.
1) Akhilesh Kumar Singh 10SETCIVL115(2010000361) 100107018
2) Mayank Bhardwaj 10SETCIVL182(2010001019) 100107108
3) JIbran Naveed 10SETCSE288(2010000859) 100101099
4) Vempati Anvesh 10SETCSE343(2010002472) 100101260
5) Ankit Anand 10SETECE251(2010000452) 100103047
Major
1) Henery Gani 10SETIT231(2010000748) 100102032
Changes in Open Elective
Anybody wishing to change their open elective can submit an application to me, LATEST BY 30th Jan providing reasons that why they would like to change their course. However, merely application does not guarantee you the change. It will depend upon the number of applications received and the seats available in the course of your choice. Keep in mind that your course may or may not change.
Monday, January 27, 2014
Feedback form for T Shirt
Those who are interested in having a customized T Shirt as a farewell gift may give their option in the below link,
Live Webinar on Indian Construction Industry
A webinar on Indian Construction Industry is being organised on 28th Jan, 2014 (Tuesday) at 03:30pm. You can join this for free and get more on the Indian Construction Industry. The details are in the below link.
Live Webinar (Tuesday 28th Jan, 03:30-04:30pm)
Click this link to register
Click here for "System Requirement"
Live Webinar (Tuesday 28th Jan, 03:30-04:30pm)
Click this link to register
Click here for "System Requirement"
syllabus for the 8th term (Jan14)
The syllabus for the current term can be downloaded from this link
Saturday, January 25, 2014
CVL013: Design of Prestressed Concrete - Tutorial 01
The Tutorial Sheet 01 for CVL013: Design of Prestressed Concrete can be accessed from the link below.
Tutorial 01.
The Class Test, based on the above Tutorial Sheet, will be conducted in the following week for all the Sections in their respective Tutorial Classes.
The students are requested to practice the above Tutorial sheet and come prepared for the Class Test, which will be considered for the Continuous Assessment (CA) Marks.
Students are also requested to bring their own calculators and Indian Standards (IS1343:1980). Use of Mobile Phone and borrowing or lending of stationery items during the class test will be strictly restricted.
Please share this to your friends.
Tutorial 01.
The Class Test, based on the above Tutorial Sheet, will be conducted in the following week for all the Sections in their respective Tutorial Classes.
The students are requested to practice the above Tutorial sheet and come prepared for the Class Test, which will be considered for the Continuous Assessment (CA) Marks.
Students are also requested to bring their own calculators and Indian Standards (IS1343:1980). Use of Mobile Phone and borrowing or lending of stationery items during the class test will be strictly restricted.
Please share this to your friends.
Friday, January 24, 2014
CVL013: Design of Prestressed Concrete - Section A, Group 2 - Change in time of Tutorial Class
Thursday, January 23, 2014
deewan housing interview UPDATE
Those students who have managed to achieve 60% after 7th term examination are also eligible to appear in tomorrow's and all other interview where eligibility criteria is 60%. Such students can give their names to manzar who will get the same approved from me for you to appear in the interview.
Those who are now eligible and do not have their co-cube id may give their names to manzar who shall get the approval from me for you to appear in tomorrow's interview.
Deewan Housing and Finance Limited: Interview on 24th Jan
INTERESTED
AND ELIGIBLE STUDENTS MAY GIVE THEIR NOMINATIONS THROUGH WWW.COCUBES.COM
INTERESTED STUDENTS ARE ADVISED TO REPORT TO AUDITORIUM-102, SET-3 at
9:30 AM SHARP TOMORROW (24th JANUARY 2014) FOR PRE-PLACEMENT
TALK.
AFTER
THE PPT, THE STUDENTS ARE ADVISED TO ASSEMBLE IN ROOM NO-202 AND 203 IN THE PGDM
BUILDING FOR FURTHER PROCESSES.
Company Name
|
Dewan
Housing Finance Corporation Ltd (www. dhfl.com)
|
Target Degrees &
Branches
|
B.Tech
(Civil)
60% and
above in B.Tech
|
CTC |
INR
3.0 LPA
Training
duration 2 months. Package would be 3.0 LPA during training also
|
Campus Date & Time
|
24th January
2014
|
Selection
Process
(No. of Interview
Rounds)
|
Group
Discussion
Technical
Interview
|
CVL013: Design of Prestressed Concrete - Syllabus and Instructional Plan
The Syllabus and the Instructional Plan for the course CVL013: Design of Prestressd Concrete can be accessed from the following links
Rockman Industries and Meeting with HOD
The JD of Roackman Industries have been floated. You must have seen the JD. Those who have not, may get the details from the placement co-ordinators.
There are 114 eligible students (60% throughout). From this only those who apply through co-cubes shall be eligible to appear in the interview.
APPLY for this company through co-cube. THE LAST DATE is 27th January.
I would like to meet all the students of final year civil engg in 102, set3 today at 02:00pm
There are 114 eligible students (60% throughout). From this only those who apply through co-cubes shall be eligible to appear in the interview.
APPLY for this company through co-cube. THE LAST DATE is 27th January.
I would like to meet all the students of final year civil engg in 102, set3 today at 02:00pm
Wednesday, January 22, 2014
PRELIMINARY GUIDELINES FOR FINAL YEAR PROJECT WORK
PRELIMINARY
GUIDELINES FOR FINAL YEAR PROJECT WORK
1.
Make groups of maximum 3-4
students.
2. Decide the topic and submit it to any of the four co-ordinators
latest by 24th Jan`14.
3. You shall be awarded a guide depending upon the topic you
have submitted. This shall be done by 28th January.
4. Submit a copy of the synopsis to the guide and if changes are
required, incorporate the same.
5. In consultation with your guide, prepare the methodology for
the project and submit it to your guide.
6. Individual project diary (with
dates) is to be maintained by each student in a group for weekly evaluation by their
project guides (out of 10 marks).
7. The guide shall award a marks in the diary every week and
shall keep the record with him as well
8. A group dairy should also
be maintained showing the weekly progress of the project with dates.
9. Any student not reporting to his/her guide for the particular
week will get zero marks for that week.
10. Rough draft of the Thesis
is to be submitted first to their respective guides by 22nd March`14
positively.
11. Final Thesis will be submitted
at the end of the semester (latest by 11th April, 2014) only after the
correction of the rough draft.
12. Project will be evaluated
based on the quality and quantity of the work done.
13. Students will be judged
based on their oral presentation and questions and answer session and also on
the quantity of work understood by the student himself regarding his/her
project.
14. The details of the
evaluation criteria and the marks distribution shall be communicated to you
soon.
Monday, January 20, 2014
STUDENT-INDUSTRY INTERACTION-VALUE OF PROJECT MANAGEMENT
SBS and Department
of Corporate affairs are organizing STUDENT-INDUSTRY
INTERACTION-VALUE OF PROJECT MANAGEMENT program on 21st January, 2014 at 10 A.M.
in PGDM Auditorium.
TECHNICAL SESSION-1 : VALUE OF PROJECT MANAGEMENT IN THE INDUSTRY- CERTIFICATION REQUIREMENTS -- MR.VIVEK SHALLY, HEAD, EDUCATION INITIATIVE, PMI, NEW DELHI
TECHNICAL SESSION-1 : VALUE OF PROJECT MANAGEMENT IN THE INDUSTRY- CERTIFICATION REQUIREMENTS -- MR.VIVEK SHALLY, HEAD, EDUCATION INITIATIVE, PMI, NEW DELHI
TECHNICAL
SESSION-2:
NEED
OF PROJECT MANAGEMENT IN SOFTWARE DEVELOPMENT PROJECTS -- MS.PARAMITA
MUKERJI, WIPRO
TECHNICAL SESSION-3: PROJECT MANAGEMENT PROCESS MATURITY FOR TELECOM AND OTHER INDUSTRIES -- MR.ABHISHEK GUPTA, ERICSSON
TECHNICAL SESSION-3: PROJECT MANAGEMENT PROCESS MATURITY FOR TELECOM AND OTHER INDUSTRIES -- MR.ABHISHEK GUPTA, ERICSSON
Lecture notes for Quantity Surveying (OEL 011)
Lecture notes and other instruction material can be found at the following link (Look into folder named 'Quantity Surveying'):
https://sites.google.com/site/civilsharda2010/downloads-1
https://sites.google.com/site/civilsharda2010/downloads-1
Saturday, January 18, 2014
Project allotment for the final term: URGENT
The final year project have to be allotted to the all the students in this week (20-24 Jan) itself. You have to contact any one of the following faculty members for the same,
Gaurav Saini
Pinaki Nayak
Meenu Kalra
Satyaprakash
Guidelines,
* Make a group of maximum 4 students
* Prepare a synopsis on what you would like to do, with the title of the project.
* The synopsis should not be more than one page.
* Based upon the submission, a guide from among the faculty shall be allotted
* NO GROUP SHALL BE ENTERTAINED AFTER 24TH JANUARY, UNDER ANY CIRCUMSTANCES
* Final list of project, title and the guide shall be displayed by 28th January, 2014
Once this is completed then you shall be briefed about the evaluation process and procedure for keeping a record of the work.
Gaurav Saini
Pinaki Nayak
Meenu Kalra
Satyaprakash
Guidelines,
* Make a group of maximum 4 students
* Prepare a synopsis on what you would like to do, with the title of the project.
* The synopsis should not be more than one page.
* Based upon the submission, a guide from among the faculty shall be allotted
* NO GROUP SHALL BE ENTERTAINED AFTER 24TH JANUARY, UNDER ANY CIRCUMSTANCES
* Final list of project, title and the guide shall be displayed by 28th January, 2014
Once this is completed then you shall be briefed about the evaluation process and procedure for keeping a record of the work.
Friday, January 17, 2014
Students List with subjects, groups and academic counsellors
The below list contains the list of the students with their sections, groups, academic counselors and the subjects they shall be studying in the current term.
Students List with subjects, groups and academic counselors
Any request of change in the section/ group shall not be entertained.
Students List with subjects, groups and academic counselors
Any request of change in the section/ group shall not be entertained.
revised co-cube test
the revised co-cube test schedule is as,
CoCubes Pre-Assessment Program Date:- 17/11/14 (9:00 AM - 12:00 Noon) | |||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-B | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-C | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-D | IT | Ms. Somya | IT Faculty-1 | 35 |
1st Floor | 206 | IT | Mr. Santosh | IT Faculty-2 | 30 |
7th Floor | 805-A | IT | Mr. Sidharth | IT Faculty-3 | 30 |
7th Floor | 805-B | CSE | Mr. Sidharth | CSE Faculty-2 | 35 |
7th Floor | 805-C | CSE | Mr. Paras | CSE Faculty-3 | 35 |
7th Floor | 805-D | CSE | Mr. Paras | CSE Faculty-3 | 35 |
7th Floor | 805-E | BIOTECH | Ms. Shikha | Biotech Faculty-1 | 35 |
8th Floor | 905 | BIOTECH | Mr. Sachin | Biotech Faculty-2 | 40 |
SET 1 | 314 | MCA | Ms. Shikha | MCA Faculty 1 | 50 |
SET 1 | 402 | CIVIL | Ms. Somya | EIE Faculty 1 | 30 |
RAC | CIVIL | Civil Faculty-2 | 35 | ||
CoCubes Pre-Assessment Program Date:- 17/1/14 (1:00 PM - 4:00 PM) | |||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | ME | Mr. Kulbhushan | ME Faculty-1 | 35 |
1st Floor | 201-B | ME | Mr. Kulbhushan | ME Faculty-1 | 35 |
1st Floor | 201-C | ME | Mr. Paras | ME Faculty-2 | 35 |
1st Floor | 201-D | ME | Mr. Paras | ME Faculty-2 | 35 |
1st Floor | 206 | ME | Mr. Sachin | ME Faculty-3 | 30 |
7th Floor | 805-A | ME | Mr. Sidharth | ME Faculty-4 | 30 |
7th Floor | 805-B | ME | Mr. Sidharth | ME Faculty-4 | 35 |
7th Floor | 805-C | CIVIL | Mr. Paras | AE Faculty-1 | 35 |
SET 1 | 314 | CIVIL | Mr. Kulbhushan | Civil Faculty-1 | 50 |
SET 1 | 402 | CIVIL | Mr. Kulbhushan | Civil Faculty-1 | 35 |
RAC | CIVIL | Civil Faculty-2 | 35 | ||
CoCubes Pre-Assessment Program Date:- 17/1/14 (4:30 PM - 7:30 PM) | |||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-B | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-C | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-D | ECE | Ms. Somya | ECE Faculty-2 | 35 |
1st Floor | 206 | ECE | Mr. Santosh | ECE Faculty-3 | 30 |
7th Floor | 805-A | ECE | Mr. Sidharth | ECE Faculty-4 | 30 |
7th Floor | 805-B | ECE | Mr. Sidharth | ECE Faculty-4 | 35 |
7th Floor | 805-C | ECE | Mr. Paras | ECE Faculty-5 | 35 |
7th Floor | 805-D | ECE | Mr. Paras | ECE Faculty-5 | 35 |
7th Floor | 805-E | EEE | Mr. Sachin | EEE Faculty 1 | 35 |
8th Floor | 905 | EEE | Mr. Sachin | EEE Faculty 2 | 35 |
SET 1 | 314 | EEE | Ms. Shikha | EEE Faculty 3 | 35 |
SET 1 | 402 | EEE | Ms. Priyadarshi | EEE Faculty 4 | 40 |
RAC | EIE | Mr. Sidharth | Civil Faculty-3 | 30 | |
RAC | AE | Mr. Sidharth | Civil Faculty-3 | 35 |
Thursday, January 16, 2014
co-cube test as scheduled
Please ensure that you attend the CoCubes Pre-Assessment test as per the
attached schedule. No second chance will be given except for those who are going
for Optimus Information and Navy SSB.
The schedule for the test is as,
The test shall be conducted on first cum first basis.
There shall be no classes tomorrow for final year students.
CoCubes Pre-Assessment Program Date:- 17/11/14 (9:00 AM - 12:00 Noon) | |||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-B | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-C | CSE | Mr. Kulbhushan | CSE Faculty-1 | 35 |
1st Floor | 201-D | IT | Ms. Somya | IT Faculty-1 | 35 |
1st Floor | 206 | IT | Mr. Santosh | IT Faculty-2 | 30 |
7th Floor | 805-A | IT | Mr. Sidharth | IT Faculty-3 | 30 |
7th Floor | 805-B | CSE | Mr. Sidharth | CSE Faculty-2 | 35 |
7th Floor | 805-C | CSE | Mr. Paras | CSE Faculty-3 | 35 |
7th Floor | 805-D | CSE | Mr. Paras | CSE Faculty-3 | 35 |
7th Floor | 805-E | BIOTECH | Ms. Shikha | Biotech Faculty-1 | 35 |
8th Floor | 905 | BIOTECH | Mr. Sachin | Biotech Faculty-2 | 40 |
SET 1 | 314 | MCA | Ms. Shikha | MCA Faculty 1 | 50 |
SET 1 | 402 | EIE | Ms. Somya | EIE Faculty 1 | 30 |
RAC | CIVIL | Civil Faculty-2 | 35 | ||
CoCubes Pre-Assessment Program Date:- 17/1/14 (1:00 PM - 4:00 PM) |
|||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | ME | Mr. Kulbhushan | ME Faculty-1 | 35 |
1st Floor | 201-B | ME | Mr. Kulbhushan | ME Faculty-1 | 35 |
1st Floor | 201-C | ME | Mr. Paras | ME Faculty-2 | 35 |
1st Floor | 201-D | ME | Mr. Paras | ME Faculty-2 | 35 |
1st Floor | 206 | ME | Mr. Sachin | ME Faculty-3 | 30 |
7th Floor | 805-A | ME | Mr. Sidharth | ME Faculty-4 | 30 |
7th Floor | 805-B | ME | Mr. Sidharth | ME Faculty-4 | 35 |
7th Floor | 805-C | AE | Mr. Paras | AE Faculty-1 | 35 |
SET 1 | 314 | CIVIL | Mr. Kulbhushan | Civil Faculty-1 | 50 |
SET 1 | 402 | CIVIL | Mr. Kulbhushan | Civil Faculty-1 | 35 |
RAC | CIVIL | Civil Faculty-2 | 35 | ||
CoCubes Pre-Assessment Program Date:- 17/1/14 (4:30 PM - 7:30 PM) |
|||||
Floor | Lab No | Department | DCA Coordinator | Faculty Coordinator | Number of students |
1st Floor | 201-A | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-B | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-C | ECE | Mr. Kulbhushan | ECE Faculty-1 | 35 |
1st Floor | 201-D | ECE | Ms. Somya | ECE Faculty-2 | 35 |
1st Floor | 206 | ECE | Mr. Santosh | ECE Faculty-3 | 30 |
7th Floor | 805-A | ECE | Mr. Sidharth | ECE Faculty-4 | 30 |
7th Floor | 805-B | ECE | Mr. Sidharth | ECE Faculty-4 | 35 |
7th Floor | 805-C | ECE | Mr. Paras | ECE Faculty-5 | 35 |
7th Floor | 805-D | ECE | Mr. Paras | ECE Faculty-5 | 35 |
7th Floor | 805-E | EEE | Mr. Sachin | EEE Faculty 1 | 35 |
8th Floor | 905 | EEE | Mr. Sachin | EEE Faculty 2 | 35 |
SET 1 | 314 | EEE | Ms. Shikha | EEE Faculty 3 | 35 |
SET 1 | 402 | EEE | Ms. Priyadarshi | EEE Faculty 4 | 40 |
RAC | CIVIL | Mr. Sidharth | Civil Faculty-3 | 30 | |
RAC | CIVIL | Mr. Sidharth | Civil Faculty-3 | 35 |
Tuesday, January 14, 2014
Thursday, January 9, 2014
QUESTION BANK
Following links will take you to the different question banks:
BMC:
https://docs.google.com/document/d/1R-gjlCrZeu5jrS3KPCQTvv88WyRKequxIH8htH30P_w/edit?usp=sharing
SOIL MECHANICS AND FOUNDATION ENGG.:
https://docs.google.com/document/d/17xLJJ9lawYvfy9td9p1MMLyOp6eXsljyZAbXeM-nM74/edit?usp=sharing
https://docs.google.com/document/d/1dhrTRRAIbTwXRMnAhcblpS0myDse6_f7McVyc5e50BY/edit?usp=sharing
BMC:
https://docs.google.com/document/d/1R-gjlCrZeu5jrS3KPCQTvv88WyRKequxIH8htH30P_w/edit?usp=sharing
SOIL MECHANICS AND FOUNDATION ENGG.:
https://docs.google.com/document/d/17xLJJ9lawYvfy9td9p1MMLyOp6eXsljyZAbXeM-nM74/edit?usp=sharing
https://docs.google.com/document/d/1dhrTRRAIbTwXRMnAhcblpS0myDse6_f7McVyc5e50BY/edit?usp=sharing
STEEL:
SURVEY:
ENV. ENGG:
https://drive.google.com/file/d/0Bwy1ZhlP9e41TmFEQjdoMjNUalE/edit?usp=sharing
https://drive.google.com/file/d/0Bwy1ZhlP9e41QkZwLUpTcW1rQ1U/edit?usp=sharing
https://drive.google.com/file/d/0Bwy1ZhlP9e41QkZwLUpTcW1rQ1U/edit?usp=sharing
RCC:
FH LAB:
IRRIGATION:
FM:
QUANTITY SURVEY:
Ad. RCC:
https://docs.google.com/document/d/1ywztQci2Qn1uGjWdvhAA32PLld7hqUAb9Yy7loN9D_k/edit?usp=sharing
CIVIL ENGG TERMS AND DEF.pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41WVBlTjVnVXEwZFk/edit?usp=sharing
CIVIL ENGINEERING COMPETITIVE QUESTIONS annacivil blog.pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41V0dVMmVZZl83VU0/edit?usp=sharing
CIVIL INTERVIEW .pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41Z0dQazlUd2xFYnc/edit?usp=sharing
CIVIL ENGG TERMS AND DEF.pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41WVBlTjVnVXEwZFk/edit?usp=sharing
CIVIL ENGINEERING COMPETITIVE QUESTIONS annacivil blog.pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41V0dVMmVZZl83VU0/edit?usp=sharing
CIVIL INTERVIEW .pdf
https://drive.google.com/file/d/0Bwy1ZhlP9e41Z0dQazlUd2xFYnc/edit?usp=sharing
Subscribe to:
Posts (Atom)